The production and application of the power industry has certain specificity,Power plant power generation and user electricity is carried out simultaneously,Can't store it。If a capacity is1000kWGenerator set,If the electric load is low1000kW,Generator is in charge of less power generation,Equipment cannot be fully utilized;If the load exceeds1000kWTime,Generator can't afford it,So the ideal situation should be balanced with power grid capacity。However, it is actually impossible to use the 巴慕达加湿器不工作 electric load.,sometimes(As the night)Electric load is small,Electricity,Grid capacity has a surplus,Generator is forced to stop or less power generation,As another day, the electricity load is large in the middle of the night.,Time peak,The grid capacity is serious,Have to pull the shutdown,Affecting industrial and agricultural production。Therefore, according to the characteristics of electricity production and use,Must have a plan、Scientifically distribute electric power,Maximize limited power to achieve reasonable utilization。 Planning electricity is to implement electricity distribution for each plant enterprise and electrical unit,Assessment four electricity indicators,Be implemented“Four”。
(1)Power quota。reasonable、Accurately allocate the day of various units、month、Annual electricity number。
(2)Fixed load。Electrical load of the 巴慕达电水壶在那修 peak of power unit。
(3)Power consumption quota。Calculate the power consumption of the production process of the unit product。
(4)Fixed load rate。Approve the average load of each unit and the highest load ratio,which is
Load factor(%)=Average load/Maximum load×100
If there is a conditional unit,Multi-level assessment,To achieve a balanced power。